作者张敏钠,李昭明,邓远君,汤剑峰(2019)在《喀麦隆曼维莱电站K80/115特大型塔机安装的施工技术》一文中研究指出:曼维莱电站地处喀麦隆,当地大型起重设备非常有限,在国内K80/115这种大型塔机安装需用100t汽车吊进行吊装;而曼维莱水电站现仅有2台50t汽车起重机,当地也无法租到100t汽车起重机,若仅为了安装塔机而采购1台100t汽车起重机到国外使用,经济上成本很高。因此,利用当地地形地势,用2台50t汽车起重机将K80/115特大型塔机的重大部件进行分解安装。制定相应吊装程序和应注意的有关问题。对类似大型设备的拆、装有一定借鉴意义。
Abstract
man wei lai dian zhan de chu ka mai long ,dang de da xing qi chong she bei fei chang you xian ,zai guo nei K80/115zhe chong da xing da ji an zhuang xu yong 100tqi che diao jin hang diao zhuang ;er man wei lai shui dian zhan xian jin you 2tai 50tqi che qi chong ji ,dang de ye mo fa zu dao 100tqi che qi chong ji ,re jin wei le an zhuang da ji er cai gou 1tai 100tqi che qi chong ji dao guo wai shi yong ,jing ji shang cheng ben hen gao 。yin ci ,li yong dang de de xing de shi ,yong 2tai 50tqi che qi chong ji jiang K80/115te da xing da ji de chong da bu jian jin hang fen jie an zhuang 。zhi ding xiang ying diao zhuang cheng xu he ying zhu yi de you guan wen ti 。dui lei shi da xing she bei de ca 、zhuang you yi ding jie jian yi yi 。
论文参考文献
论文详细介绍
论文作者分别是来自福建水力发电的张敏钠,李昭明,邓远君,汤剑峰,发表于刊物福建水力发电2019年01期论文,是一篇关于塔机论文,安装论文,方案论文,福建水力发电2019年01期论文的文章。本文可供学术参考使用,各位学者可以免费参考阅读下载,文章观点不代表本站观点,资料来自福建水力发电2019年01期论文网站,若本站收录的文献无意侵犯了您的著作版权,请联系我们删除。
标签:塔机论文; 安装论文; 方案论文; 福建水力发电2019年01期论文;